Design

August Update

Posted on
Aiguille Rouge

Firstly, sorry I haven’t posted in a while; Snow Trax had taken a back seat after I changed jobs in February; don’t worry though, I’m back on the project now. In July, I’ve managed to get back to the social media posting (Instagram and Facebook), and the blog posting (see this months blog post on […]

Design

The Metalwork

Posted on

Wow, a lot has been happening in the last 3 weeks on Snow Trax, so much so that I forgot to post an update! ┬áThe metal I am building the prototype units out of has turned up, I’ve ordered a pillar drill to help with the fabrication, and I’ve had a roller coaster ride with […]